Has been almost 2 weeks with no progress. I was working out of town, then heavy rain, then 8 days below freezing. Snowing and raining today too. Should be above freezing the next 5 days during the day, so hopefully it will dry out some.
At least I got some Clear Trans Pedals from the bicycle chain in Raleigh. My old shop.
I also wanted to thank Jim-C at Sunday and the guys at Empire BMX for working with me to get these custom wheels built. They were patient and really worked to get me what I wanted. All I need now is the Eastern Brake lever and I think I will be done for ahwile.
Subscribe to:
Post Comments (Atom)
I must say, that Model C is one of the best looking I've ever seen!
ReplyDeleteThanks for the post!
ReplyDelete